Prima

Quote Q-26134

Arthur Care — Sippy Downs clinic
Demo 02 Oct 2026
Quote total (ex GST)
$182,257
$200,482.70 inc GST
Estimated cost
$148,154
26 lines · 13 cost codes
Margin
18.7%
$34,103 gross profit
Mix
Furniture Material Labour Subcontract
Estimate Accepted
DescriptionTypeQtyUnit costMarkupCostSell
Preliminaries$13,724$18,113
Site establishment, amenities & floor protection Labour 1 lot $2,600.00 35% $2,600 $3,510
Project management & site supervision Labour 3 wk $2,650.00 35% $7,950 $10,733
Skip bins & waste removal
Binway Waste & Skips
Subcontract 3 ea $690.00 15% $2,070 $2,380
Final builders clean & handover Labour 240 m² $4.60 35% $1,104 $1,490
Design & Documentation$5,808$7,217
Workspace design — concept, layout & finishes schedule Labour 28 hr $96.00 35% $2,688 $3,629
Building approval & certification (Certa Building Certifiers)
Certa Building Certifiers
Subcontract 1 lot $3,120.00 15% $3,120 $3,588
Partitions & Ceilings$32,008$40,614
Plasterboard partitions — 92mm steel stud, acoustic insulated, set & sanded Labour 38 lm $238.00 35% $9,044 $12,209
Suspended ceiling 1200×600 — fine fissured tile, new grid Labour 156 m² $64.00 35% $9,984 $13,478
Framed glazed office fronts with hinged doors & manifestation
Clearline Glass & Glazing
Subcontract 11 lm $1,180.00 15% $12,980 $14,927
Joinery$16,580$22,383
Reception counter — Polytec Ravine Natural Oak, Essastone top, DDA section Labour 1 ea $8,900.00 35% $8,900 $12,015
Staff kitchenette — overheads, island bench, Essastone tops Labour 3 lm $1,640.00 35% $4,920 $6,642
Storage wall with lockers & joinery doors Labour 2 lm $1,380.00 35% $2,760 $3,726
Electrical & Lighting$17,760$20,424
Electrical — power to layout, LED panel & feature lighting, switchboard upgrade
Voltline Electrical
Subcontract 240 m² $74.00 15% $17,760 $20,424
Data & Comms$2,730$3,140
Cat6A data outlets, patching & comms cabinet
Netpoint Data & Comms
Subcontract 15 pt $182.00 15% $2,730 $3,140
Mechanical (HVAC)$11,520$13,248
Mechanical — ductwork modifications, diffusers & re-balance
Airflow Mechanical Services
Subcontract 240 m² $48.00 15% $11,520 $13,248
Plumbing$9,600$11,040
Plumbing — kitchenette sink, Zip HydroTap & HWS
Pipeline Plumbing & Gas
Subcontract 1 lot $9,600.00 15% $9,600 $11,040
Floor Finishes$14,475$16,646
Interface carpet tiles — supply & lay, incl. floor prep
Floorworks Commercial Flooring
Subcontract 173 m² $61.00 15% $10,553 $12,136
Luxury vinyl plank to kitchen, breakout & wet areas
Floorworks Commercial Flooring
Subcontract 53 m² $74.00 15% $3,922 $4,510
Painting$5,796$6,665
Paint walls, ceilings & doors — Dulux Wash&Wear, 2 coats
Brushmark Painting & Decorating
Subcontract 504 m² $11.50 15% $5,796 $6,665
Furniture$12,515$16,019
Reception lounge, 3-seater modular — Charcoal wool
Buro Seating
Furniture 2 ea $1,850.00 28% $3,700 $4,736
Buro Metro II task chair, 24/7 rated — Charcoal fabric
Buro Seating
Furniture 7 ea $395.00 28% $2,765 $3,539
Electric sit-stand desk 1400×700, single motor — White / White frame
Workspace Commercial Furniture
Furniture 7 ea $590.00 28% $4,130 $5,286
Tower storage 1800H with coat locker — Natural Oak
Workspace Commercial Furniture
Furniture 3 ea $640.00 28% $1,920 $2,458
Acoustic Solutions$2,038$2,608
Autex Cube acoustic wall panel 12mm — Assorted
Autex Acoustics
Material 19 m² $58.00 22% $1,102 $1,344
Install acoustic panels, screens & pods Labour 13 hr $72.00 35% $936 $1,264
Signage$3,600$4,140
Reception wall sign (3D acrylic) & glazing manifestation
SignCraft Signage
Subcontract 1 lot $3,600.00 15% $3,600 $4,140
Subtotal (ex GST)$148,154$182,257.00
GST 10%$18,225.70
Total (inc GST)$200,482.70
Client
Natalie Arthur · natalie@arthurcare.com.au
Unit 3, 10 Chancellor Village Boulevard, Sippy Downs QLD
Estimator: Marcus Reid · Quoted 28 Aug 2026 · Valid to 27 Sep 2026
Client approval

Accepted on 11 Sep 2026 — project raised.

Open project PCF-26042 →
Cost codes
Preliminaries$18,113 · 24%
Design & Documentation$7,217 · 20%
Partitions & Ceilings$40,614 · 21%
Joinery$22,383 · 26%
Electrical & Lighting$20,424 · 13%
Data & Comms$3,140 · 13%
Mechanical (HVAC)$13,248 · 13%
Plumbing$11,040 · 13%
Floor Finishes$16,646 · 13%
Painting$6,665 · 13%
Furniture$16,019 · 22%
Acoustic Solutions$2,608 · 22%
Signage$4,140 · 13%